Vulnerabilities (CVE)

Filtered by vendor Oracle Subscribe
Filtered by product Primavera P6 Enterprise Project Portfolio Management
Total 63 CVE
CVE Vendors Products Updated CVSS v2 CVSS v3
CVE-2018-11039 3 Debian, Oracle, Vmware 33 Debian Linux, Agile Plm, Application Testing Suite and 30 more 2024-11-21 4.3 MEDIUM 5.9 MEDIUM
Spring Framework (versions 5.0.x prior to 5.0.7, versions 4.3.x prior to 4.3.18, and older unsupported versions) allow web applications to change the HTTP request method to any HTTP method (including TRACE) using the HiddenHttpMethodFilter in Spring MVC. If an application has a pre-existing XSS vulnerability, a malicious user (or attacker) can use this filter to escalate to an XST (Cross Site Tracing) attack.
CVE-2018-1000632 5 Debian, Dom4j Project, Netapp and 2 more 15 Debian Linux, Dom4j, Oncommand Workflow Automation and 12 more 2024-11-21 5.0 MEDIUM 7.5 HIGH
dom4j version prior to version 2.1.1 contains a CWE-91: XML Injection vulnerability in Class: Element. Methods: addElement, addAttribute that can result in an attacker tampering with XML documents through XML injection. This attack appear to be exploitable via an attacker specifying attributes or elements in the XML document. This vulnerability appears to have been fixed in 2.1.1 or later.
CVE-2018-0735 6 Canonical, Debian, Netapp and 3 more 23 Ubuntu Linux, Debian Linux, Cloud Backup and 20 more 2024-11-21 4.3 MEDIUM 5.9 MEDIUM
The OpenSSL ECDSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.1.1a (Affected 1.1.1).